GENERAL MANUFACTURED
HOME INSPECTION CHECKLIST
INSPECTION REQUESTS MUST
BE RECEIVED BEFORE 4:00 PM OF THE PREVIOUS WORKING DAY
INITIAL or SITE/SETBACK
INSPECTION
Verify plot plan information and setbacks
Site (Stand): vegetation
removed; leveled; graded and drained; vapor barrier (if under footings; not permitted
under slab); anchor approval, location and installation
Cut and Fill Site
(Stand): If on fill exceeding 12 inches in depth below the bottom of the
footings a soils compaction test shall be provided by the owner.
May be combined with the
foundation/runner inspection
ALLOW ONE
DAY FOR INSPECTION BEFORE SCHEDULING CONCRETE. |
FOUNDATION/RUNNERS
INSPECTION
Foundation/Slab/Concrete runner forms (wire
mesh or rebar in place and suspended) - Chapter 3-5 and 3-8
Anchor approval, location and installation
(when required) - Chapter 3
SETUP INSPECTION
Blocking or Piers - Chapter 3-8
Electrical Feeder Inspection -
may require approval by State Electrical Inspector prior to Setup Inspection -
Chapter 4-2
Vapor Barrier on ground - 6 mil thickness -
Chapter 3-4.7
Temporary Steps installed at doors -
Chapter 3-12.2
Gasline Test (3 PSI of air pressure for 10
minutes - (the County does not provide test equipment) -
Chapter 6-5.3(a)1
Hook-up and lines to
sewer or septic tank and water source -
Sewer (18 ga. green tracer
wire required) and
Water (18 ga. blue tracer wire required) - Chapter 5-3.5(d) and 5-2.4(d)
FINAL INSPECTION (access
required)
Check/Test Smoke Detectors and GFCIs
- Chapter 1-8.13
Skirting installed - Chapter 3-9 and
3-10.2.1
Proper amount of venting provided (1sf./ea.
150 sf.) -
Chapter 3-10.1.2 and Table 3-D
Access to underfloor at cleanouts and water
shut-off valve -
Chapter 5-3.3 and 5-2.6
Permanent Steps installed at all doors (3
ft. x 3 ft. square landing min.) - Chapter 3-12